Notice of Badger Road Bridge Replacement Over Kewaskum Creek

The Town of Kewaskum is proposing to replace the Badger Road Bridge over Kewaskum Creek.

The proposed project involves a bridge replacement and approach reconstruction for a total project construction length of approximately 300 feet. Project construction is anticipated to begin in June 2023 and will be completed in approximately two to three months.

Project informational packets are available for pick up at the Town of Kewaskum Town Hall, 9019 Kettle Moraine Drive, Kewaskum. Anyone with a concern for or knowledge about historic buildings and structures and archeological sites are encouraged to provide comments to the local unit of government or MSA Professional Services, Inc.

Questions or comments concerning the project can be directed to any of the following individuals: 

Leah Rhodes, MSA Professional Services, Inc. (MSA), [email protected] , (608) 355-8945; 

Scott Wollner, Town of Kewaskum Chairperson, [email protected] , (262) 483-6720;

Tim Hayes, Town of Kewaskum Engineer, [email protected] , (414) 477-9000.